News 210-Metre Bridge Over NH-48 Completed for Mumbai-Ahmedabad Bullet Train Project The pre-stressed concrete bridge is strategically located between the Vapi and Bilimora stations along the bullet train corridor Post Navigation Previous News18 Pulse: One Nation, One Election | 80.1% Respondents Back Reform; Support Highest In Central IndiaNext HMPV Not The Next Covid-19, But Caution Is Advised, Warns Top Virologist More Stories News Senthil Balaji, Ponmudy Resign As Tamil Nadu Ministers; Mano Thangaraj Returns News Indian Diaspora Protest Across The World Over Pahalgam Terror Attack | Check Photos News Temple ‘Purification’ Row: BJP Expels Ex-Rajasthan MLA Gyan Dev Ahuja From Party